Marine Warranty Surveyor for MHI Vestas – 2018
Acted as marine warranty surveyor for several repair and maintenance projects in the UK.
Customer: MHI Vestas

Galloper Offshore Wind Farm – 56 Siemens Gamesa 6 MW – 2017
Client representative on crane vessel during turbine erection.
Customer: Siemens Gamesa

Veja Mate – 67 Siemens 6 MW – 2017
Client representative during turbine erection.
Customer: Siemens Gamesa

Block Island Offshore Wind Farm – 5 GE Energy Haliade 150 6 MW – 2016
Offshore Support to installation team.
Customer: GE Wind, France

Sand Bank Offshore Wind Farm – 72 Siemens 4.0 MW – 2015-2016
Approval of method statements and riskassesments for pile installation and turbine erection. Client representative on crane vessels during pile installation and turbine erection.
Customer: Vattenfall GmbH Germany

DanTysk Offshore Wind – 80 Siemens 3.6 MW – 2013 -2014
Inspection of new build crane vessels. Approval of method statements and risk assessments for pile installation and turbine erection. Client representative on crane vessels during pile installation and turbine erection.
Customer: Vattenfall GmbH Germany

Northwind – 72 Vestas 3 MW – 2013-2014
Inspection of crane vessel during construction.
Participated in several planning meetings.
Client representation on crane vessel during turbine erection.
Customer: Northwind – InControl S.A. Luxembourg
London Array Wind Farm – 175 Siemens 3.6 MW – 2011 -2012
Inspection and trial trips with new build crane vessels.
Approval of method statements and risk assessments for pile installation and turbine erection.
Client representative on crane vessels during pile installation and turbine erection.
Customer: London Array Ltd. UK (DONG, EON and Masdar)

Walney II – 51 Siemens 3.6 MW – 2011
Supervision during installation of mono piles using a floating crane barge.
Customer: DONG Energy UK

Marine Warranty Surveyor for Siemens – 2011
Acted as marine warranty surveyors for Siemens for a repair project for 4 UK wind farms (Linn Inner Drowsing, Gunfleet Sands, Burbo Bank and Ryhl Flats) using MPI Resolution.
Approved all necessary material to do the operation and issued COAs. Followed repair jobs partly.
Customer: Siemens UK

Ormonde – 30 Repower 6 MW – 2011
Called in to improve installation speed of turbine erection.
Partly supervision of turbine erection.
Customer: Ormonde Offshore Wind Ltd. – Vattenfall Europe

Thanet Offshore Wind – 100 Vestas 3 MW – 2010
Inspection and preparation of installation vessel.
Supervision of windmill erection.
Customer: Thanet Offshore Wind Ltd. – Vattenfall Europe

Sprogoe Offshore Wind Farm – 7 Vestas 3 MW – 2009
Inspection and preparation of installation vessel.
Supervision of windmill erection.
Customer: Vestas Offshore A/S

Belwind 1 – 55 Vestas 3 MW – 2009
Different consultancy work.
Called in as independent surveyor during pile installation after 2 piles during tow out had sunk. Negotiations with Belgian authorities concerning tow out of piles.
Customer: Belwind B.V.

Robin Rigg Offshore Wind Farm – 60 Vestas 3 MW – 2008 -2009
Participated in production of method statements and risk assessments.
Inspection and preparation of installation vessels.
Supervision of windmill erection.
Customer: Vestas Offshore UK

Alpha Ventus – 6 Repower 5MW – 2008
Followed building of installation vessel.
Supervision of turbine erection.
Customer: Vattenfall Germany
Prinses Amalia Windpark (Q7) – 60 windmills each 2 MW – 2007-2008
Participated in production of method statements and risk assessments.
Inspection of Installation vessels.
Supervision of windmill erection.
Customer: Vestas Offshore NL

Egmond an Zee – 36 Vestas 3MW – 2007
Made all risk assessments for pile installation.
Approved method statements for pile installation and for turbine erection.
Safety officer on crane vessel during pile installation.
Customer: Ballast Nedam and Vestas NL

Barrow – 30 Vestas 3 MW – 2005 -2006
Approved method statements and risk assessments for pile installation and turbine erection.
Client representative on crane vessel during installation on piles, laying interfiled cables and during turbine erection.
Customer: KBR and Vestas UK

Kentish Flats – 30 Vestas 3MW – 2004 -2005
Approved method statements and risk assessments for pile installation.
Followed UXO survey on survey vessel.
Client representative on vessels during pile installation and turbine erection.
Customer: Vestas UK

Horns Rev I (Refurbishment) 2004
80 Vestas 2MW
Involved in planning of refurbishment of all nacelles.
Client representative on crane vessels during project.
Customer: Vestas DK

Scroby Sands – 30 Vestas 2MW – 2003 -2004
Approved method statements and risk assessments for pile installation and turbine installation.
Trouble shooting on cable laying.
Client representative on crane barge and vessel during installation of piles and turbine erection.
Client representative on vessel during stone dumping for scour protection.
Customer: Vestas UK

North Hoyle – 30 Vestas 2MW – 2003
Following conversion of jack up barge.
Helped to develop method statements and risk assessments for pile installation and turbine erection.
Client representative on crane barges during installation.
Customer: Vestas UK

Horns Rev 1 – 80 Vestas 2 MW – 2002
Customer: Vestas UK